Improvement to Kolhapur-Sawantwadi Road – Feasibility study
The assignment involved selecting the most viable alignment for the five routes from Kolhapur to Sawantwadi. The total length of these five routes was 536.91 Km.
- Kolhapur- Nipani- Sankeshwar -Ajara - Amboli - Sawantwadi. (After deduction of NH length) - 95.60 Km
- Kolhapur — Nipani — Gandhinglaj — Ajara — Amboli — Sawantwadi. (After deduction of NH length) - 109 Km.
- Kolhapur —Gargoti — Patgoan — NH-17 — Sawantwadi. (After deduction of NH length) - 137.50 Km
- Kolhapur — Radhanagari — Dhajipur — Phonda-Kalmath (NH-17) —Kudal - Sawantwadi. (After deduction of NH length) - 98.60 Km.
- Kolhapur — Ganganbawada — Vaibhvawadi — Kasarade — Kankavali — Kudal — Sawantwadi (After deduction of NH length) - 96.21 Km
- Total cost of project: Rs. 1200 crores

Visit UK Website 