Improvement to Kolhapur-Sawantwadi Road – Feasibility study

The assignment involved selecting the most viable alignment for the five routes from Kolhapur to Sawantwadi. The total length of these five routes was 536.91 Km.

  • Kolhapur- Nipani- Sankeshwar -Ajara - Amboli - Sawantwadi. (After deduction of NH length) - 95.60 Km
  • Kolhapur — Nipani — Gandhinglaj — Ajara — Amboli — Sawantwadi. (After deduction of NH length) - 109 Km.
  • Kolhapur —Gargoti — Patgoan — NH-17 — Sawantwadi. (After deduction of NH length) - 137.50 Km
  • Kolhapur — Radhanagari — Dhajipur — Phonda-Kalmath (NH-17) —Kudal - Sawantwadi. (After deduction of NH length) - 98.60 Km.
  • Kolhapur — Ganganbawada — Vaibhvawadi — Kasarade — Kankavali — Kudal — Sawantwadi (After deduction of NH length) - 96.21 Km
  • Total cost of project: Rs. 1200 crores

Feasibility Study & Detailed Project Report for NH66 (17) near Pen connecting to Khopoli terminating at NH48 (4)

  • Total length of road: 33.328 Km (rigid pavement)
  • 2 lane with pavement quality concrete / rigid pavement for the length of 30.628 Km.
  • 4 lane with pavement quality concrete / rigid pavement for the length of 2.70 Km.
  • Major bridges 3 Nos. (2 Nos. x 100m + 1 Nos. 72m)
  • Minor bridges 14 nos. (Total length = 190 m)
  • Vehicular underpass - 2 nos.
  • Flexible pavement - 3.90 Km (Connectors)
  • Micro surfacing on pavement quality concrete (PQC) pavement is also proposed using latest technology.
  • Total cost of project: Rs. 323.88 crores

Laxmi Mandir to Dhayari Phata to Nanded City (Sinhagad Road)

Kashec worked on an 8km road which was constructed in 'Bituminous' as well as 'Pavement Quality Concrete'. It includes:

  • The successful construction of 3 bridges, the combined length of which is approximately 110m.
  • Widening of existing road to development plan (DP) width of 36m by providing 6 lane carriageway with median.
  • Construction of 2.5m wide carriageway using 100 mm thick paver blocks on both sides with storm water drains below.
  • Cycle track 2.1m wide with 60mm thick paver blocks on both sides of the road.

Link road between Nagar & Paithan Road at Aurangabad

This project dealt with the development of a 4 lane link road, one major bridge consisting of a four lane deck with parapet abutments, thin piers, returns, approach slab etc

  • Total length of the road is 4.126km.
  • Carriageway width: 7.5 X 2m with a median of 600mm.
  • Length of bridge: 70m
  • Span configuration of bridge: 10m span 7 nos
  • Total cost of project: Rs. 34.53 crores

Supervision & Quality Control for Work under Pradhan Mantri Gram Sadak Yojana Phase VI, VII, IX and Asian Development Bank Ratlam

The project involved quality control & supervision of the entire execution of all CD works in the alignments, small bridges, box culverts etc. including quality tests of materials & finished pavement, submitting of all reports (RFI, DPR, MPR) & contractors bill checking, co-ordination with contractor & client.

  • Total length of road: 140km
  • Total cost of project: Rs. 150 crores

Hadapsar to Saswad Road

The project involved the construction of 30m wide, 1.2km long six lane road.

  • Length of road: 1200m
  • Width of road: 30m
  • Width of footpath: 4.5m one side
  • 6 lane pavement quality concrete road
  • 15m wide concrete bridge over canal with an adjacent 3m wide steel footbridge.
  • All underground utility services with central median
  • Total cost of project: Rs. 18 crores

Lalbahaddur Shastri Road

This is a 24m wide, 1.2km long road.

  • The project involved redevelopment of Pune City's main connecting link for North-South directional traffic which has commercial units on both sides. This makes it a very important road in the infrastructure of Pune City.
  • Developments proposed were to utilise full ROW with crust design for projected traffic, provision of storm water RCC duct, junction improvement, utility services, medians, kerbs, etc.
  • Total cost of project: Rs. 6 crores

Hotel Amarpreet to Beed Bypass Road

This project included improvement of existing road 1.9km long, 16m wide bituminous road.

  • Length of road 1.99km.
  • Width of road: 16m
  • Width of footpath: 1.50m
  • Two spans of 7m each a minor bridge. Width 19m with 1.7m wide footpath
  • Approach length is 30.95m towards Amarpreet Hotel & 23m toward Beed Bypass.
  • Total cost of project:Rs. 10.36 crores

Road from Jalgaon T Point to Harsool T Point

  • The project consisted of four lane 4.96 km long road.
  • 19.10m wide Bituminous road, 1.50m wide footpath.
  • Total cost of project: Rs. 11.20 crores

Mundhwa Road

  • The project consisted of construction of a 3.3km long road.
  • 24m wide four Lane B.T. road, footpath width: 3m both side.
  • Total cost of project:Rs. 18 crores

Bhairoba Pumping Station to Magarpatta City

  • The project consisted of construction of 1.6km long road.
  • 18m wide four lane concrete pavement quality concrete road, width of footpath 1.5m (each side).
  • Total cost of project: Rs. 14 crores

Road connecting Integrated School Complex to NH17

  • Total Length of Road: 480m
  • Total Width: 17m (two lane road)
  • Carriageway: 14m Footpath Stadium compound wall side 1m. and School complex side 2m.
  • Total cost of project: Rs. 8.50 crores

Road connecting NH4A to Miraculous Cross Church

  • Total Length of road 700m.
  • Total width of road 7m
  • Bridge: 25mm asphalt concrete, 50mm thick DBM, 50mm thick BM with Crash Barrier
  • Pipe Culvert: Width 6m, Length 8m, pipes used were 1200mm dia and 600mm dia.
  • Total cost of project: Rs. 1.18 crores