Improvement to Kolhapur-Sawantwadi Road – Feasibility study
The assignment involved selecting the most viable alignment for the five routes from Kolhapur to Sawantwadi. The total length of these five routes was 536.91 Km.
- Kolhapur- Nipani- Sankeshwar -Ajara - Amboli - Sawantwadi. (After deduction of NH length) - 95.60 Km
- Kolhapur — Nipani — Gandhinglaj — Ajara — Amboli — Sawantwadi. (After deduction of NH length) - 109 Km.
- Kolhapur —Gargoti — Patgoan — NH-17 — Sawantwadi. (After deduction of NH length) - 137.50 Km
- Kolhapur — Radhanagari — Dhajipur — Phonda-Kalmath (NH-17) —Kudal - Sawantwadi. (After deduction of NH length) - 98.60 Km.
- Kolhapur — Ganganbawada — Vaibhvawadi — Kasarade — Kankavali — Kudal — Sawantwadi (After deduction of NH length) - 96.21 Km
- Total cost of project: Rs. 1200 crores
Feasibility Study & Detailed Project Report for NH66 (17) near Pen connecting to Khopoli terminating at NH48 (4)
- Total length of road: 33.328 Km (rigid pavement)
- 2 lane with pavement quality concrete / rigid pavement for the length of 30.628 Km.
- 4 lane with pavement quality concrete / rigid pavement for the length of 2.70 Km.
- Major bridges 3 Nos. (2 Nos. x 100m + 1 Nos. 72m)
- Minor bridges 14 nos. (Total length = 190 m)
- Vehicular underpass - 2 nos.
- Flexible pavement - 3.90 Km (Connectors)
- Micro surfacing on pavement quality concrete (PQC) pavement is also proposed using latest technology.
- Total cost of project: Rs. 323.88 crores
Laxmi Mandir to Dhayari Phata to Nanded City (Sinhagad Road)
Kashec worked on an 8km road which was constructed in 'Bituminous' as well as 'Pavement Quality Concrete'. It includes:
- The successful construction of 3 bridges, the combined length of which is approximately 110m.
- Widening of existing road to development plan (DP) width of 36m by providing 6 lane carriageway with median.
- Construction of 2.5m wide carriageway using 100 mm thick paver blocks on both sides with storm water drains below.
- Cycle track 2.1m wide with 60mm thick paver blocks on both sides of the road.
Link road between Nagar & Paithan Road at Aurangabad
This project dealt with the development of a 4 lane link road, one major bridge consisting of a four lane deck with parapet abutments, thin piers, returns, approach slab etc
- Total length of the road is 4.126km.
- Carriageway width: 7.5 X 2m with a median of 600mm.
- Length of bridge: 70m
- Span configuration of bridge: 10m span 7 nos
- Total cost of project: Rs. 34.53 crores
Supervision & Quality Control for Work under Pradhan Mantri Gram Sadak Yojana Phase VI, VII, IX and Asian Development Bank Ratlam
The project involved quality control & supervision of the entire execution of all CD works in the alignments, small bridges, box culverts etc. including quality tests of materials & finished pavement, submitting of all reports (RFI, DPR, MPR) & contractors bill checking, co-ordination with contractor & client.
- Total length of road: 140km
- Total cost of project: Rs. 150 crores
Hadapsar to Saswad Road
The project involved the construction of 30m wide, 1.2km long six lane road.
- Length of road: 1200m
- Width of road: 30m
- Width of footpath: 4.5m one side
- 6 lane pavement quality concrete road
- 15m wide concrete bridge over canal with an adjacent 3m wide steel footbridge.
- All underground utility services with central median
- Total cost of project: Rs. 18 crores
Lalbahaddur Shastri Road
This is a 24m wide, 1.2km long road.
- The project involved redevelopment of Pune City's main connecting link for North-South directional traffic which has commercial units on both sides. This makes it a very important road in the infrastructure of Pune City.
- Developments proposed were to utilise full ROW with crust design for projected traffic, provision of storm water RCC duct, junction improvement, utility services, medians, kerbs, etc.
- Total cost of project: Rs. 6 crores
Hotel Amarpreet to Beed Bypass Road
This project included improvement of existing road 1.9km long, 16m wide bituminous road.
- Length of road 1.99km.
- Width of road: 16m
- Width of footpath: 1.50m
- Two spans of 7m each a minor bridge. Width 19m with 1.7m wide footpath
- Approach length is 30.95m towards Amarpreet Hotel & 23m toward Beed Bypass.
- Total cost of project:Rs. 10.36 crores
Road from Jalgaon T Point to Harsool T Point
- The project consisted of four lane 4.96 km long road.
- 19.10m wide Bituminous road, 1.50m wide footpath.
- Total cost of project: Rs. 11.20 crores
Mundhwa Road
- The project consisted of construction of a 3.3km long road.
- 24m wide four Lane B.T. road, footpath width: 3m both side.
- Total cost of project:Rs. 18 crores
Bhairoba Pumping Station to Magarpatta City
- The project consisted of construction of 1.6km long road.
- 18m wide four lane concrete pavement quality concrete road, width of footpath 1.5m (each side).
- Total cost of project: Rs. 14 crores
Road connecting Integrated School Complex to NH17
- Total Length of Road: 480m
- Total Width: 17m (two lane road)
- Carriageway: 14m Footpath Stadium compound wall side 1m. and School complex side 2m.
- Total cost of project: Rs. 8.50 crores
Road connecting NH4A to Miraculous Cross Church
- Total Length of road 700m.
- Total width of road 7m
- Bridge: 25mm asphalt concrete, 50mm thick DBM, 50mm thick BM with Crash Barrier
- Pipe Culvert: Width 6m, Length 8m, pipes used were 1200mm dia and 600mm dia.
- Total cost of project: Rs. 1.18 crores